Project Overview

The City of Plymouth is improving roads, trails, and utilities along Vinewood Lane between Rockford Road (County Road 9) and Northwest Boulevard (County Road 61), as shown on the project area map.

Proposed improvements include:

  • Construction of a roundabout at the intersection of Vinewood Lane and the entrance to the mall parking lot (near Sunshine Factory)
  • Vinewood Lane conversion from 4-lanes to 3-lanes between the mall entrance (Sunshine Factory) and Northwest Boulevard
  • Installation of a trail on the west side of Vinewood Lane from Rockford Road to Northwest Boulevard
  • Installation of a sidewalk or trail on the east side of Vinewood Lane from Rockford Road to the entrance to the mall parking lot (near Kohl's)
  • Pedestrian curb ramp installation in accordance with the Americans with Disabilities Act (ADA)
  • New curb and gutter
  • Stormwater, sanitary sewer, and watermain repairs

Access will be maintained to all owner/business throughout construction. However, detours and delays should be expected.

 

Project Updates and Email Archive
Anticipated Schedule
Additional Information

Contact

Joe Shamla, Assistant City Engineer
Plymouth City Hall | 3400 Plymouth Blvd. | Plymouth, MN 55447-1482
P 763-509-5541 | jshamla@plymouthmn.gov

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download Windows Media Player Download Word Viewer Download Excel Viewer Download PowerPoint Viewer