Project Update
Reclaiming Vicksburg Lane Underway
The contractor for the Vicksburg Lane Rehabilitation Project is milling and reclaiming the pavement on half of the roadway. This work is expected to be completed this weekend. Starting next week the contractor will begin paving the initial layers of asphalt on these lanes. Once the paving of the initial layers of pavement is complete the contractor will begin work on the remaining lanes of Vicksburg Lane. While the roadway remains open to traffic local motorists may experience delays. Please exercise caution when driving through the construction area and follow all construction signage.

COVID-19 Note:  Please Follow Precautions
Community health and safety is our priority. As a precaution aimed at slowing the spread of the coronavirus (COVID-19), please do not approach workers or staff at the construction site. Residents who have question or concerns about the project should call or email city staff/the project manager.

The City of Plymouth is following the recommended guidelines from the Centers for Disease Control and Prevention (CDC) and the Minnesota Department of Health – which encourage social distancing (maintaining a 6-foot distance from others) and reducing the frequency of gatherings.

 Vicksburg GIS Map V2 thumbnail

Vicksburg Lane Reclamation
Project Area Map (PDF)

Project Overview                                       
This proposed project includes reclaiming (removing) the pavement and paving a new roadway surface on Vicksburg Lane from State highway 55 to County Road 6 as shown on the location map. Other improvements include:

  • Installation of a trail on the east side of Vicksburg Lane from 32nd Avenue to the access to Vicksburg Marketplace
  • Replacement of portions of trail on the west side of Vicksburg Lane
  • Installation of concrete pedestrian ramps, as necessary, in accordance with the Americans with Disabilities Act (ADA)
  • Replacement of a minimal amount of concrete curb and gutter, when the concrete is in poor condition
  • Repairs to water main valves and storm sewer catch basins

In addition to the improvements on Vicksburg Lane the adjacent streets listed below are also proposed to be improved:

  • 32nd Avenue – Partial street reconstruction
  • Ranchview Lane – Street reclamation
  • 31st Avenue – Mill and overlay

Anticipated Schedule

  • Open House: 4:30-6:30 p.m. February 6
    Plymouth City Hall
    3400 Plymouth Boulevard
  • Public Hearing: March 10, 2020
  • Construction: Summer and Fall 2020

Additional Information

Project Update Emails
Below is a list of project update eNotify emails that have been sent to subscribers of the Vicksburg Lane Reclamation Project. Subscribe online to receive the emails.

Contact 
Mike Payne, Assistant City Engineer
Plymouth City Hall | 3400 Plymouth Blvd. | Plymouth, MN 55447-1482
P 763-509-5538 | F 763-509-5510 | mpayne@plymouthmn.gov

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer