Project Overview

This project involves the mill and overlay or pavement rehabilitation of Peony Lane north of Highway 55. Also included in the project is rehabilitation of the Peony Lane bridge over the Canadian Pacific Railroad.

Preventative maintenance performed with the project includes:
  • Installation of concrete pedestrian ramps, as necessary, in accordance with the Americans with Disabilities Act (ADA)
  • Replacement of concrete curb and gutter where the curb and gutter are in poor condition
  • Repairs to water main valves
  • Repairs to storm sewer catch basins
  • Repairs to sanitary sewer manholes
Project Updates
Anticipated Schedule
Additional Information
Project Email Notifications

Contact

Joe Shamla, PE, Assistant City Engineer
Plymouth City Hall | 3400 Plymouth Blvd.
P 763-509-5541 | jshamla@plymouthmn.gov

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download Windows Media Player Download Word Viewer Download Excel Viewer Download PowerPoint Viewer